Skip to content

GUANGZHOU JUNXIN INFORMATION TECHNOLOGY CO., LTD.

Validate first. Invest second.
Put green energy and treatment technology to work on site.

Junxin works with energy companies, industrial plants and business parks to organise integrated energy, site teams and advanced industrial wastewater treatment. Data, pilots and milestones—not slogans—determine whether a project should proceed.

Industrial wastewater pilots & equipment · Integrated-energy project organisation · Site & overseas workforce

  • Start on siteDefine conditions and boundaries
  • Validate with dataTest before committing capital
  • Own the handoverAgree milestones and acceptance

PROJECT BRIEF

Turn the first question
into a useful brief.

No contact details are needed at this step. The choices carry into the full enquiry form.

THREE BUYER PATHS

Choose by the decision
you need to make.

Each path states what can be organised, what should be delivered and what Junxin will not claim before verification.

01 / PRIMARY

Advanced industrial wastewater treatment

For selected PCB, rare-earth and copper-foil streams; deliver diagnosis, pilot testing and modular equipment.

No uniform cost-reduction promise. “Zero sludge” is not a selling claim.Open water treatment ↗
02 / ENERGY

Integrated-energy delivery

Planning and coordination for solar, storage and energy-use optimisation.

Unclosed investments are not presented as operating achievements.Discuss an energy project ↗
03 / WORKFORCE

Site teams & overseas workforce

Outsourcing, project staffing and EOR/HRO coordination around roles, location and timing.

No employment promise before the responsible licensed local entity is verified.Open workforce services ↗

Power testing and O&M are organised through qualified implementing entities and are not promoted here as an owned CMA/CNAS testing capability.

FIVE STEPS

A project path with
a decision at every stage.

  1. 01

    Discuss the need

    Define the decision and operating context.

  2. 02

    Assess the approach

    Set scope, parties and evidence.

  3. 03

    Validate or pilot

    Use tests and records to decide.

  4. 04

    Coordinate delivery

    Manage interfaces and milestones.

  5. 05

    Accept and review

    Check results and close out.

START WITH A BRIEF

Turn the requirement into
the first discussable document.

Use the enquiry form or email info@junxinglobal.com. Enquiries are reviewed manually; response time depends on the completeness and complexity of the project context.